真人游戏 (中国)有限公司官网

熱線電話
百葉窗圖片載入中
?
聯系我們

Guangdong Lituo automation equipment Co., Ltd

Contact: Mr. Zhang

Sales Hotline: 18665717216

Telephone: 020-84551179

Fax: 020-31076026

QQ:731306804

Mailbox: zhangging@litou668.com

URL: www.409h.xyz

Address: Almond altar town, shunde district, foshan city, GaoZan Village Gao Gui Lucy 2 no. 1 # 3

What should the daily use of the coating machine pay attention to?

What should be noted for the daily use of the cladding machine? Coating machine price reasonable coating machine manufacturers to tell you about.

Is a paint coating machine process instead of the past tradition, and has been a machine widely used in the field, but as every kind of machine, it will have its life, some people do not pay attention to maintenance and maintenance may soon be damaged, unable to run, and a good maintenance habits will bring you unexpected structure, may greatly extend the period of use of wrapping machine. Therefore, the maintenance and maintenance of the cladding machine is very important. Then, what should we do to maintain and maintain it?

1, coating machine manufacturers, coating machine work should keep the phase clean, in order to avoid some dust fall into the system of coating, directly lead to the quality of the coating.

2, speed reducer lubricating oil coating machine which in use after a month for the first time, should be to replace the lubricating oil for its new, after every six months for a replacement, in the workload stage, every three months to be replaced once a. In summer, when the temperature is relatively hot, you should replace the viscous reducer lubricant. When the temperature is low in winter, you should change the viscosity reducer lubricant. Place the butter in the chain once a month.

3, after work, you must turn the main power off.

4, the maintenance of the machine or adjust parts, should be handled by the relevant professional.

We must pay attention to the use of the process, the operation must be in accordance with the following operating procedures, to correct the operation of the coating machine. In order to avoid damage to the coating machine, resulting in failure, can not work properly.

百家乐赢一注| 太阳城代理最新网址| 百家乐官网网站程序| 百家乐改单| 大发888注册 大发888官网| 百家乐娱乐软件| 百家乐官网机器图片| 百家乐官网路纸计算| 高额德州扑克视频| 澳门百家乐的玩法技巧和规则| 青鹏百家乐官网游戏币 | 哪个百家乐投注比较好| 百家乐官网破解方法技巧| 皇冠百家乐官网代理网| BET365体育在线| 365棋牌游戏| 大发888体育投注| 路劲太阳城样板间| 真人百家乐软件云南景| 百家乐概率投注| 真人百家乐官网视频| 真人百家乐官网玩法| 百家乐官网送彩金平台| 网上大发扑克| 大发888刮刮了下载| 大哥大百家乐的玩法技巧和规则| 百家乐赌博破解方法| 哪个百家乐最好| 百家乐官网群的微博| 百家乐官网正负计| 赌博百家乐官网有技巧吗| 百家乐官网注码投注论坛| 百家乐官网视频赌博| 百家乐官网2号破解下载| 百家乐官网棋牌官网| 百家乐官网十赌九诈| 太阳城百家乐官网祖玛| 百家乐官网娱乐城网站| 7人百家乐官网桌子| 网络百家乐官网免费试玩| 星河百家乐官网现金网|